This 132,000-square-foot tilt-up concrete building included a premier exterior elevation upgrade with a cedar façade design to enhance the entry and lumber vestibules.
The project contained unique challenges associated with the site development which included 35-foot keystone retaining walls and over 220,000 cubic yards of imported fill material.